Menu

Intel Data Center GPU Max 1450 128GB HBM2e OAM

Intel Data Center GPU Max 1450 128GB HBM2e OAM — 128GB HBM2e 600W OAM data-center GPU for high-performance computing, scientific workloads, AI acceleration and OAM-based enterprise compute systems. Request Quote for current availability and pricing.

BrandIntelSKUARS-AI-MAX1450-128GBCategoryNetworking & AI Infrastructure

Explore Related

Related products, categories and research.

Intel Data Center GPU Max 1450 128GB HBM2e OAM Overview

Intel Data Center GPU Max 1450 128GB HBM2e OAM is a 600W OAM data-center GPU designed for high-performance computing, scientific workloads, AI acceleration and OAM-based enterprise compute systems. It uses the Intel Xe-HPC / Ponte Vecchio platform and is configured with 128GB HBM2e.

This product is listed as Request Quote / legacy channel because enterprise accelerator pricing is not consistently published through ordinary retail channels. AI Robot Supplier does not manufacture a market price when a reliable current public selling price cannot be verified. Buyers can instead request a commercial quotation based on quantity, destination, configuration, warranty route and current channel availability.

For procurement teams, the important comparison points include accelerator memory, compute architecture, form factor, system compatibility, power and thermal requirements, software ecosystem, virtualization or multi-device scaling and the expected workload. These factors often matter more than comparing a single headline performance number.

Key Features

  • Enterprise AI hardware: designed for high-performance computing, scientific workloads, AI acceleration and OAM-based enterprise compute systems.
  • Memory configuration: 128GB HBM2e.
  • Architecture: Intel Xe-HPC / Ponte Vecchio.
  • Professional deployment: requires a validated server or system environment rather than an ordinary consumer PC.
  • Quote-based procurement: current quantity, condition, warranty and lead time can be confirmed before purchase.

Enterprise AI accelerators should be selected as part of a complete system design. CPU, system RAM, storage, PCIe topology, network fabric, power, cooling and application support all affect real-world performance. Before ordering, confirm that the target software stack supports the accelerator and that the host platform meets the manufacturer’s hardware requirements.

Intel Data Center GPU Max 1450 128GB HBM2e OAM Applications

The Intel Data Center GPU Max 1450 128GB HBM2e OAM can be considered for high-performance computing, scientific workloads, AI acceleration and OAM-based enterprise compute systems. Suitability depends on the target framework, model architecture, numerical precision, memory requirements, latency targets and deployment scale.

AI Training and Inference

For supported AI workloads, verify compiler/runtime support, framework integration, model compatibility and any precision-specific requirements. Large-model deployment should also consider model parallelism, memory footprint and network communication between accelerators.

Enterprise and Research Infrastructure

Research laboratories, cloud operators and enterprise AI teams should evaluate support lifecycle, software maturity, orchestration, virtualization, observability and spare-hardware strategy before standardizing on a new accelerator platform.

Intel Data Center GPU Max 1450 128GB HBM2e OAM Specifications

Brand Intel
Architecture Intel Xe-HPC / Ponte Vecchio
Memory 128GB HBM2e
Product Class 600W OAM data-center GPU
Xe Cores 128
Memory 128GB HBM2e
TDP 600W
Form Factor OAM
Host Interconnect PCIe Gen5
Xe Link 26.5 GB/s across 16 physical ports
Architecture Xe-HPC
Commercial Status Request Quote / legacy channel

Specification note: exact OEM part numbers, board revisions, thermal designs, software versions and system configurations can vary. Final configuration should be confirmed on the commercial quotation.

Compatibility and Deployment

This product should not be assumed compatible with a standard desktop system. Confirm the host server or accelerator baseboard, PCIe or OAM interface, power delivery, cooling, firmware, operating system, drivers, runtime and application support.

For multi-accelerator deployment, also validate scale-up/scale-out topology, Ethernet or other interconnect requirements, CPU NUMA design, storage throughput and cluster orchestration. Providing your target server model and workload before ordering helps reduce compatibility risk.

Request a Quote for Intel Data Center GPU Max 1450 128GB HBM2e OAM

No fixed regular price is published on this product page because a dependable current public standalone market price was not available. Contact AI Robot Supplier with the required quantity, delivery country and preferred configuration for current procurement pricing.

A quotation can specify product configuration, condition, warranty route, lead time, shipping terms and payment instructions. For high-value enterprise hardware, the exact product revision and included accessories should be confirmed before payment.

Browse related products in Networking & AI Infrastructure.

Manufacturer reference: Intel product documentation.

Intel Data Center GPU Max 1450 128GB HBM2e OAM FAQ

Why is this product listed as Request Quote?

The manufacturer or enterprise channel does not provide a reliable public retail unit price that can be used without guessing. Pricing is therefore confirmed against current channel availability.

Can AI Robot Supplier source multiple units?

Quantity requests can be reviewed based on current channel inventory, delivery destination and required configuration.

What should I send for a compatibility check?

Provide the server or workstation model, intended workload, required quantity, existing accelerator configuration, power/cooling environment and software stack.

Is this a consumer graphics card?

No. This is enterprise AI or HPC hardware and may require purpose-built servers, accelerator baseboards or specialized power and cooling.

Can I receive a proforma invoice?

Yes. Once configuration, quantity, price, delivery terms and availability are confirmed, a formal quotation or proforma invoice can be prepared.

Are specifications guaranteed for every sourced unit?

The page describes the named product family/configuration. Exact part number and revision should be reconfirmed on the quotation before purchase.

Recently viewed

WhatsApp Chat with our sales team